temporary buildings, emergency shelters, storage, accommodation temporary buildings, temporary shelters, temporary storage, emergency buildings, temporary office space, prefab, fabric, shelters, accommodation, mobile, warehousing, fast to erect, buy, hire or rent from Aganto UK
building solutions aganto top border filler www.aganto.com
 

temporary storage buildings with toilets bathrooms and showers from Aganto

Additional Services - Sanitation

Standards of sanitation are constantly improving in line with the Health & Safety directives to provide the best possible amenities for all on-site personnel.

Toilets
temporary storage buildings with toilets bathrooms and showers from Aganto
There is an ever increasing range of quality, type and style of temporary or semi-permanent toilets available. The availability of drainage will determine whether a recirculating serviced loo is required, or a mains drainage toilet - macerator pumps are also widely used.

Module Units
These are ideally suited to the longer term hire market. Features include:-

Separate toilet cubicles
Water heaters
Towel dispensers
Automatic air fresheners

They require:-

Mains electrical supply
External Water supply
Level ground
And either mains drainage, septic tank or can be supplied as a self-sufficient recirculating unit.

This design of toilet can also be supplied as a single unit.

Trailer Units
panasonic hand basin
Standard or Luxury. These are suited to shorter term hires, are self-contained and very comfortable. They have no need for permanent water supply or mains drainage.

Showers
When we talk through client shower requirements we consider:-

People through-put
Maintenance
Energy Supply
Drainage
Hygiene Factors

It is essential to ensure that the design and installation of shower facilities are complimentary to those of the toilet facilities.

Click on temporary buildings - temporary storage - temporary structures and temporary warehouses to contact us for a free no obligation quote from Aganto
  or Telephone +44 (0)1635 202979


 

 

Emergency | Home Page | About Us | Structures
Total Solutions - 'Turn-Key' | Applications | Case Studies | Health & Safety | Structural Integrity
Additional Services | Glossary of Terms | Contact | Site Map | Related Links

address HEAD OFFICE:
Red Shute Mill,
Red Shute Hill,
Hermitage,
Berkshire,
RG18 9QL
STOKE:
Unit 5,
Netherset Lane Industrial Estate
Madeley,
Crewe,
Cheshire,
CW3 9PE
telephone +44 (0)1635 202 979
fax +44 (0)1635 200 546
e-mail buildingsolutions@aganto.co.uk


© Copyright 2003 - Aganto - All Rights Reserved
 

www.aganto.com