Case Studies

Home >> Case Studies

Trading store for Travis Perkins

Travis Perkins achieve huge cost and time savings by using Aganto buildings instead of permanent buildings on new sites.

Aganto Warehouses create immediate cost savings for Constar

Huge cost savings achieved for Constar by keeping warehousing on-site with Aganto temporary warehouses.

Industrial canopy solution to keep waste dry

Aganto temporary building helps Viridor trial a new recycling programme.

Temporary warehouse helps fulfil supermarket order

Aganto warehouse buildings help leading tomatoe producer when supermarket order was much larger than expected.

Loading Area for Pace Logistics

Pace Logistics avoid the cost implications of wet damage by purchasing two linked canopy buildings from Aganto.

Temporary Building Keeps Company On Track After fire

Emergency retail building installed after ram raid and arson attack at HG Gladwell damages their Country Store.

Storage Building Keeps Production On Track For Emtelle

Leading manufacturer of ducted network and blown fibre solutions uses Aganto building for additional production space and machinery.

Additional storage for Power Station

Didcot B Power Station use Aganto temporary buildings to help with their outage and maintenance programmes.

Temporary Building Houses Waste Processing Facility

Travis Perkins achieves huge cost savings by using an Aganto storage building to house their in-house waste management programme.

Loading Bay Canopy Protects Against Wet Damage

Loading bay canopy protects goods from wet damage during loading and unloading activity.

Temporary Fire Station During Re-Build Project

Temporary fire station building from Aganto used during rebuild project at Uttoxeter fire station.

Painting Workshop for Piper Boats

Piper Boats hire a temporary workshop building from Aganto to provide a dust free area for painting and free up space in the main production building.

Temporary Fire Station at Hanley During Re-build Project

Staffordshire Fire and Rescue Service hire a temporary fire station from Aganto during their PFI rebuild project at Hanley.

Land Clean Limited

Temporary buildings used to house contaminated soil during cleaning and decontamination of land project.

Emergency Art, Media & Drama School after Fire

After a fire destroyed the art, media and drama facilities at the University of Westminster, Aganto came to the rescue with an 1800 sq m replacement building that was installed in a week.

Additional Storage for Shanks Waste Management

Waste management company Shanks, uses temporary storage building to help fulfill a long-term contract with East London Waste Authority.

Temporary Fire Station During Rebuild Project

Temporary appliance bays for Poole fire station ensures emergency service remains at full strength during rebuild project.

Moulton College Teaching Workshop

Temporary teaching workshop used to accommodate overflow of brickwork students.

Waste Reduction & Recycling Ltd

Temporary storage building helps Waste Reduction & Recycling with a site clearance project.

Rockline Warehousing

Warehouse extension unit enables Rockline industries to manage their growth in sales.

Kerrygold

Temporary building houses production line during refurbishment project at Kerrygold.

On-Site Storage Building for Cathelco

Temporary storage building for Cathelco provides interim solution before future move to larger premises.

Special Solution for Special School

Metal Pressings Group

Additional storage protects high value tools and equipment from wet weather damage for Metal Pressings Group.