Background
Due to increased growth, leading butter manufacturers, The Kerrygold Company, were undergoing a major redevelopment at their factory in Staffordshire.
Requirement
Their packing store had been demolished to make way for a new facility, and during this time the production line had to be moved into a temporary building.
Solution
Aganto provided the instant solution of an insulated modular structure 20m x 65m x 6.2m high comprising a thermoroof, polymer composite walling, one loop activated rapid rise door, three pedestrian doors and lighting.
Benefit
By opting for the Aganto structure Kerrygold achieved an effective on-site solution that ensured convenience and continued productivity.