---
title: Glamping Fires expand their manufacturing process with Aganto temporary workshop
date: 2023-04-20T10:22:00+01:00
author: Isabel Dudley
canonical_url: "https://www.aganto.co.uk/our-projects/glamping-fires-temporary-workshop"
section: Projects
---
#  Glamping Fires expand their manufacturing process with Aganto temporary workshop 

 Glamping Fires / Workshop 

 

 

 

  

 

 

  

 

 

 

 

    

     ![temporary-workshop-for-manufacturing-glamping-pods](/uploads/generic/images/_1669x700_crop_center-center_none/temporary-workshop-for-manufacturing-glamping-pods.jpg)  

 

 Glamping Fires are a supplier of high-quality glamping equipment based in Ammanford, Wales. This includes manufacturing glamping pods as well as supplying and installing wood burning stoves, wood fired hot tubs and fire pits. When they decided it was time to expand their manufacturing process they came to Aganto for a temporary solution.

 

 

 

##  Add-ons used 

 ![](/uploads/generic/images/icons/Insulated.svg) 

 

Insulation

 

 

 ![](/uploads/generic/images/icons/Roller-Shutters.svg) 

 

Roller shutters

 

 

 

 

 

 

 

    ![CJ Davis 20230016](/uploads/generic/images/buildings/_520x378_crop_center-center_none/CJ-Davis-20230016.jpg)  

   ![CJ Davis 20230010](/uploads/generic/images/buildings/_520x378_crop_center-center_none/CJ-Davis-20230010.jpg)  

 

 

 ##  The Challenge 

 

 

 The business was looking for additional space in order to increase the number of glamping pods being manufactured on their site, allowing them to meet a growing demand for their products. They required rental of a new [temporary workshop](https://www.aganto.co.uk/temporary-buildings/workshop) to provide additional space in a short period of time without the commitment of building a permanent structure.

 

 

   

"Highly recommend! From point of contact to a full built structure. Seamless and no hassle."

 

 Chris Davies - Glamping Fires Commercial Manager

 

 

  

 

 

  

 

 

  

 

 

 

 

 

 ##  Our Solution 

 

 

 The Aganto team soon attended site to assess Glamping Fires’ requirements and discuss a solution most suited to their needs. We were able to provide:

- A 15m x 20m x 6.2m insulated temporary workshop
- Increased onsite manufacturing capacity
- Protection for both employees and structures from the Welsh elements

All our temporary structures are designed for durability. Built using robust industrial strength aluminium frames they are capable of withstanding snow and wind loadings to BSEN1991 standards.

 

 

   

“This solution has effectively helped Glamping Fires to expand manufacturing capacity and meet a growing demand for their products, helping them to operate at increased efficiency.”

 

 Andy Gilman, Area Sales Manager, Aganto

 

 

  

 

 

  

 

 

  

 

 

 

 

 

  Download this case study 

Please click the link to download a PDF of the Glamping Fires case study

 

 

 [  Download PDF ](#) 

 

 

 

  

 

  

 

 

 

  

 

  Share project   

---

 

Additional projects

 

 [     ![temporary building delivered in two weeks](/uploads/generic/images/projects/_518x352_crop_center-center_none/Waterways-hero.jpg)  

 Waterways Garden Centre  / Retail 

 When Waterways Garden Centre was damaged by heavy snowfall, they required an immediate solution to continue trading. 

 View project 

 ](https://www.aganto.co.uk/our-projects/waterways-garden-centre-temporary-building-retail) [     ![fully insulated temporary structure to accommodate warehouse storage and vehicle workshop](/uploads/generic/images/projects/_518x352_crop_center-center_none/Bott_Hero.jpg)  

 Bott Group  / Warehouse 

 Bott Group wanted to increase warehouse storage and workshop space at their Ashby de la Zouch site to reduce off-site storage costs. 

 View project 

 ](https://www.aganto.co.uk/our-projects/bott-group-temporary-warehouse-building) 

 

 

 

 

   

   Experienced, hands-on, industry experts 

 

What makes us different

Our in-house industry experts are hands-on, from initial scoping to ongoing maintenance, delivering and installing temporary structures on time and within budget.  
  
The cost-effective way to grow your business is with fast, flexible, high-quality temporary space

 

 [Explore our approach](https://www.aganto.co.uk/our-approach)
