---
title: Rutland Plastics purchase Aganto temporary building for additional warehousing
date: 2023-05-11T15:54:00+01:00
author: Lauren Foster
canonical_url: "https://www.aganto.co.uk/our-projects/rutland-plastics-temporary-warehousing"
section: Projects
---
#  Rutland Plastics purchase Aganto temporary building for additional warehousing 

 Rutland Plastics / Warehouse 

 

 

 

  

 

 

  

 

 

 

 

    

     ![temporary warehouse for increased operational capacity](/uploads/generic/images/projects/_1669x700_crop_center-center_none/Rutland-Plastics-Hero.jpg)  

 

 Located in Oakham, Rutland Plastics is one of the leading manufacturers of plastic injection moulding, working with a diverse range of clients to supply effective designs and solutions. Since they began operations in 1969, the business has excelled, leading to an expansion to accompany their growth.

 

 

 

##  Add-ons used 

 ![](/uploads/generic/images/icons/Insulated.svg) 

 

Insulated

 

 

 ![](/uploads/generic/images/icons/Pedestrian-Access.svg) 

 

Pedestrian access

 

 

 ![](/uploads/generic/images/icons/Roller-Shutters.svg) 

 

Electric roller shutter door

 

 

 

 

 

 

 

 ##  The Challenge 

 

 

 Within their facility, the storage area for raw materials was limited, which reduced their ability to store additional stock for their busy production line. Understanding that they needed a dedicated space to house their extra materials, they contacted Aganto to provide a temporary building solution.

 

 

    ![Aganto temporary building for additional warehousing](/uploads/generic/images/projects/_520x378_crop_center-center_none/Rutland-Plastics-1.jpg)  

   ![dedicated temporary space to house extra materials](/uploads/generic/images/projects/_520x378_crop_center-center_none/Rutland-Plastics-5.jpg)  

 

 

 ##  Our Solution 

 

 

 Following a site visit to identify their requirements, Area Sales Manager, Paul Watmore, took Rutland Plastics to another Aganto client’s site to view a structure in use.

Impressed with the quality and efficiency of our buildings, Rutland Plastics progressed with an order for:

- A clear span 15m x 30m x 4.2m temporary warehouse
- Installed with insulation and sandwich cladding
- Solid gables and guttering
- One electric roller shutter door and two pedestrian access doors

The [temporary warehouse](https://www.aganto.co.uk/temporary-buildings/warehouse) has enabled Rutland Plastics to effectively improve the storage of raw materials for projects in their factory. The ability to store more stock has increased operational capacity and improved the facility for a more efficient manufacturing workflow.

 

 

   

“This temporary building has provided Rutland Plastics with an effective solution to allow for increased operational capacity and improved storage space, ultimately resulting in a much more efficient workflow throughout their manufacturing process.”

 

 Paul Watmore, Area Sales Manager, Aganto

 

 

  

 

 

  

 

 

  

 

 

 

 

 

  Download this case study 

Please click the link to download a PDF of the Rutland Plastics case study

 

 

 [  Download PDF ](#) 

 

 

 

  

 

  

 

 

 

  

 

  Share project   

 

 

 

   

   Experienced, hands-on, industry experts 

 

What makes us different

Our in-house industry experts are hands-on, from initial scoping to ongoing maintenance, delivering and installing temporary structures on time and within budget.  
  
The cost-effective way to grow your business is with fast, flexible, high-quality temporary space

 

 [Explore our approach](https://www.aganto.co.uk/our-approach)
