Linking Temporary Buildings

Request a
FREE Site Visit

Request a FREE
Quote or Call Back

View our
Build Process

How do buildings get linked?

To ensure full integration with your existing facilities and processes we can link our structures to your own buildings or to each other.

These weather-proof links for temporary buildings will help you ensure

  • employees, goods and equipment are kept dry at all times.
  • processes and procedures are kept as efficient as possible.

 

Typical applications for linked temporary buildings

  • linking a loading canopy to an existing warehouse.
  • linking a warehouse temporary building to an existing production facility.
  • gutter-linking two hire structures together to create the overall sq m needed.

 

Installation and dismantle

The link is fitted as part of the standard installation process.

For hire contracts when linked temporary buildings need to be removed, the links are dismantled and taken away along with the temporary building. This is an easy process that allows your site and buildings to quickly go back to their original state with no evidence or residual of the link.

For more information on our temporary building construction and build process call us today or fill in our enquiry form.

Free Site Visits for Temporary Buildings

To make sure you get the right building for your requirements, budget and site, we will carry out a no obligation site survey, free of charge. This can be done at any time convenient to you.

How to arrange a temporary building site visit

Our Clients

© 2017 Aganto  |  Terms of Use  |  Privacy Policy  |  Enquiry Form  |  Sitemap  |  Website Design Quiet Storm Solutions Ltd

Cookie Policy