Creating a unique temperature-controlled environment within our client's existing warehouse
Our client in Cambridge is a market-leading consultancy business specialising in progressing new growth ideas from concept through design and development to commercial success.
Through innovative thinking, they provide a human-centred approach to developing breakthrough technology, including the first self-service parking system and seaweed replacements for plastics.
Add-ons used
The Challenge
The client required a bespoke solution that would allow them to control temperature and humidity within an area of their existing warehouse. As an innovative business, it was important that the temporary building solution was adaptable and well-suited to their needs.
The designated workshop space would need to:
- Enable temperature and humidity control
- Fit within their existing 40m x 70m x 12m warehouse structure
- Include insulated roofing and walling
"We’re really pleased with our temporary structure from Aganto, which enables us to create a climate-controlled area inside our warehouse at a much lower cost than building a permanent space. The structure was delivered quickly, and their install team worked efficiently to complete the build ahead of schedule. The quality of the structure is great, and really exceeded our expectations. They were very happy to adapt with minimal fuss to our bespoke request to install the structure against an existing wall and create an opening over the door. We’re really pleased with how they adapted their standard design to produce a solution that fits our needs, and it looks really professional too."
Senior Consultant Project Manager
Our Solution
Aganto Area Sales Manager, Paul Watmore, visited the site to complete an initial assessment and propose the best solution for our client’s needs. Following the visit, we recommended and delivered:
- A 15m x 15m structure with a height of 5.2m
- An insulated roof, inflated with a specially designed air pump
- Walls insulated with 40mm thick steel sandwich cladding
- Linkage to the existing structure through two double doors
- Completed installation within just a few days
The Aganto team collaborated closely with the client throughout their time on site to ensure that none of their existing operations were disrupted.
The building immediately provided a space that allowed our client to test and develop their technologies in a secure and temperature-controlled environment. Our in-house industry experts ensure that our clients have a great experience with us.
From initial scoping to ongoing maintenance, we strive to provide the best possible solutions on time and within budget. If you’re looking for a temporary building solution inside an existing structure, contact our team today to discuss your options.
“We’re pleased to have delivered a practical, cost-effective solution for our client, which will allow them to continue to test and develop breakthrough technologies within a temperature-controlled environment.”
Paul Watmore, Area Sales Manager, Aganto
Please click the link to download a PDF of the case study
What makes us different
Our in-house industry experts are hands-on, from initial scoping to ongoing maintenance, delivering and installing temporary structures on time and within budget.
The cost-effective way to grow your business is with fast, flexible, high-quality temporary space