A trusted partner for temporary buildings: Hudson Kapel’s ongoing collaboration with Aganto

Hudson Kapel is a leading name in the car auction industry, specialising in re-marketing nearly new, damaged and salvaged vehicles.
As their operations grew, additional space was required to assess, repair and prepare vehicles for auction. That’s where Aganto stepped in, supplying three custom-built temporary structures to help streamline their processes.
Add-ons used
The Challenge
Hudson Kapel first reached out to Aganto in 2023, initially requiring a temporary building solution to be used for assessing damage to vehicles. As the business grew, they then required a further two buildings, which would be used for a range of different purposes including valeting, photography and repair work.


Our Solution
Aganto Area Sales Manager Andy Gilman visited Hudson Kapel’s Worcester site to assess their needs and propose a bespoke solution for a structure tailored to their requirements.
The first building, installed in June 2024 at the same site, entailed:
- A larger 20m x 30m part insulated structure
- 4.2m leg height
- Open sides on one half of the building to allow easy access for valeting
- Blackout roof on the other half to create ideal lighting for photography
- A built-in turntable creating accessibility for showcasing vehicles from every angle
A second, more complex structure was installed at nearby Throckmorton Airbase in 2024 and included:
- A 25m x 50m frame
- 4.2m leg height
- Extreme precision in positioning due to only 4mm clearance at the apex, leaving no room for error
To transform it into a fully functional repair workshop, Aganto provided a complete electrical fit out, including:
- Emergency lighting
- Fire alarms
- Carbon monoxide alarms
- Extractor fans with full insulation
This installation ensured that Hudson Kapel had a dedicated space equipped with all the necessary safety and operational features to carry out repair work effectively.


A unique project:
The Aganto team are used to having to adapt to complete complex builds. One of the biggest challenges of this project was the installation of the workshop building inside an existing aircraft hangar. With only 4mm of clearance between the new structure and the hangar’s apex, there was absolutely no room for error. To ensure precision, Paul Prest Aganto’s senior site manager conducted multiple technical site visits, meticulously measuring and planning every detail before installation. This careful preparation allowed the team to execute the build flawlessly, despite the space constraints.
Another unique challenge was the installation of a blackout roof for the valeting and photography building. This feature was a new addition for the Aganto team, as most temporary structures do not require this level of light control. However, the team quickly adapted to the requirement, ensuring that the blackout roof was fitted correctly to create the perfect environment for vehicle photography.
The workshop building also required a complex electrical fit-out, including fire alarms, emergency lighting, carbon monoxide alarms, and extractor fans to allow staff to complete repairs in a safe, controlled environment. Aganto’s expertise in integrating these critical systems ensured that the new building was fit for purpose, transforming the space into a fully functional repair facility.


Another successful build:
Aganto delivered all three buildings on time and to spec, helping Hudson Kapel expand their operations. With new dedicated spaces for damage assessment, valeting, photography, and repairs, they can now process vehicles more effectively, improving both turnaround times and auction presentation.
This project highlights Aganto’s ability to provide customised, high-quality temporary building solutions, no matter how complex the challenge.
“We’re proud to have developed a positive, trusting relationship with our client through successful delivery of multiple temporary buildings. This multi-faceted solution will enable Hudson Kapel to expand their operations and process more vehicles more effectively.”
Andy Gilman, Area Sales Manager, Aganto
Please click the link to download a PDF of the case study
What makes us different
Our in-house industry experts are hands-on, from initial scoping to ongoing maintenance, delivering and installing temporary structures on time and within budget.
The cost-effective way to grow your business is with fast, flexible, high-quality temporary space