Case Studies

Home / Case Studies

Temporary storage building relocation at Rolls Royce is ‘Newt’ a problem

Retractable Tunnel at Kloeckner Metals UK – a year on

Car seat manufacturer gains over 10,000 sq ft of on-site warehousing with 65 metre building

Pre-used temporary building injects space into plastic moulder’s production facility

What’s pallet storage costing you?

What are the hidden costs of pallet storage and how can you optimise efficiency whilst keeping costs down and comply with pallet storage regulations?

Temporary Industrial Building helps grow specialist garment laundry capacity

Efficiency and better working environments are top priorities for Bott

Leading manufacturer of safety critical cold forge components chooses Aganto

Sweet smell of success: expansion with multiple connecting temporary structures

When a leading global fragrance manufacturer needed more space for storage and loading, Aganto responded to the challenge.

Insulated temporary warehouse replaces permanent building for less cost

Really? Replacing a permanent building with a temporary insulated warehouse?

Environment Agency rent temporary building for water quality improvement works

The Environment Agency removed an automatic trash screen at Lea Marston lakes, Sutton Coldfield on the River Teme as water quality improvements had rendered it redundant.

Inconvenience of managing stock off-site solved by Aganto temporary buildings

Burnetts Manufacturing used a third party logistics provider to store products off site and help facilitate their business growth. The inconvenience of managing stock off site however became a pressing issue and needed resolving.

Call today for a free site visit for your temporary building

To make sure you get the right building for your requirements, budget and site, we will carry out a no obligation site survey, free of charge. This can be done at any time convenient to you.