Waste processing temporary canopy requirement.

 

Viridor wanted to embark on a trial programme at their Sheffield site of processing waste into fuel for the cement kiln industry. The project required a quick solution to cover the shredding machine and to ensure that the waste was kept completely dry, an industrial temporary canopy was recommended.

Viridor already had an Aganto building at their Manchester site and were therefore confident in using an Aganto canopy for this additional requirement. After surveying the site and gaining an understanding of the overall objectives for Viridor, Aganto supplied and installed a 15m wide by 20m long x 4m high industrial temporary canopy building around the shredding machine to avoid any disruption to the waste processing operation.

After a successful trial of the temporary canopy, additional units are planned to cater for expansion.

Bob Thomson, Unit Manager at Viridor Sheffield

“Hiring the Aganto industrial canopy building has enabled us to trial this new procedure quickly and with minimal cost and risk. It became clear early on that by using the industrial canopy structure the waste could be kept dry and produced to the tight tolerances required so we are now working on expanding the programme and installing a much larger Aganto building.”

See more information about temporary canopy buildings and buildings for commercial waste processing or call us to speak to a prefabricated buildings expert.

Call today for a free site visit for your temporary building